Hilton Hotel Lobby Stainless Steel Installation Art
The process is complex and requires high requirements, and the incisions of stainless steel are different in deepening decomposition. Every process of welding, grinding, polishing and electroplating strives for perfection.
The production time period of chandelier in Hilton Hotel lobby is long, the effect is remarkable and the originality is good. Visual shock of large installations. Large stainless steel ribbons are flying like a dragon in the air.
The lobby of Chongqing Hi-Tech Hilton Hotel
- matteo
- Guzhen China
- 40 days
- 50 sets one month
Details
Hilton Hotel Lobby Stainless Steel Installation Art
5-star hotel custom-made large stainless steel unique design 3D drawing design installation art. This stainless steel installation art is a non-embroidered steel installation in the lobby of Chongqing Hi-Tech Hilton Hotel. The Hilton hotel lobby stainless steel installation art total length is about 40 meters. Through three-dimensional model modeling, the shape is confirmed, and then decomposed, deepened, split, cut stainless steel, cut bayonet, welded, polished and electroplated, spliced, and then hoisted for trial adjustment. From the stairs to the top of the lobby, the momentum is like a rainbow,which means Changhong all the way up to the sky, like a dragon flying in the air. This kind of five-star hotel project has high requirements, delicate details and flawless electroplated parts. High-rise scaffolding construction workload is huge, and installation technology is difficult. Our technical director and installation master are present to install it professionally and carefully. Customers are satisfied with on-site inspection, and the effect is better than expected.
Size: | L28000*W7000*H3800MM | Light: | Spotlight from ceiling |
Material: | Stainless steel | Space: | Sales department lobby |
Color: | Blue | Style: | Modern |
Process: | Electroplating | Item No: | H035 |
Custom service
1.Enquiry
2.According the requirements quote the price and make the sketch drawing.
3.Confirm the details and pay the deposit.
4.Make the design and production drawing .
5.Start production according to the drawing.
6.Take pictures after finishing production, inspection after production
7.Pay the balance after inspection, arrange shipment.
8.Installation service (can be provided according to the contract)
Product Tag
Get the latest price? We'll respond as soon as possible(within 12 hours)