CONVENTION AND EXHIBITION CENTER HOTEL IN XIAMEN
Xiamen International Conference Center Hotel
Project Name:Xiamen International Conference Center Hotel (five-start)
Number of guest rooms: 208
Service: deepen design, production, installation
Number of lamps: 865
Maximum lamp size: 4000*3500*3500MM
Maximum lamp weight: 488KG
Total project time: 9 months
Further design time: 4 months
Production time: 3 months
Installation time:2 months
occupies the beautiful Huandao Road, adjacent to the main venue of the 28th China Golden Rooster and Hundred Flowers Film Festival. The hotel has a first-line luxury sea view room, and the super-large sea view terrace can enjoy the charming sea. It looks like a luxury cruise ship on the Maritime Silk Road, with a total length of 325 meters. Designed by the bricks night scene creator, it presents beautiful "cruise windows", stacks of bricks and a bright night scene of a big gold ingot.
The custom-made dynamic chandelier is installed in the center of the hotel lobby, which can be seen when entering the hotel. The size of the large hotel chandelier is 4000*3500*3500MM, which consists of four groups of stainless steel and acrylic leaves with the same shape. Each leaf is combined with different shades of blue and different green tones, which completely uses the color of sea elements. Each acrylic is a double-sided texture, reflecting more colors through light, which is very dazzling. Heavy-duty mute engine and heavy-duty bearing are installed on the chandelier, and the program is set to rotate once in 40 seconds. When in use, it rotates very quietly and slowly, which is more attractive than the stationary chandelier, and people can't help looking at it and appreciating it.
Customized large-scale rotating chandeliers will not emit light, and mainly rely on 16 LED spotlights on the ceiling to illuminate. After the hotel opens, it will become the most dazzling large-scale artwork in the hotel lobby by combining sunlight and light refraction effect and rotating slowly.
The maximum load of heavy-duty engine and bearings is 800KG, and the net weight of the installation art is 400KG. Add lubricating oil for maintenance every 18 months.
Due to the particularity of hotel foundation installation points, it is necessary to make special embedded parts to be installed on ceilings.
The process of assembly and testing in the factory workshop