KAI YUAN MING DU HOTEL IN ZHEN HAI
New Century Mingdu Hotel
Project name: New Century Grand Hotel
Service:deepen design, production,installation
Custom products: crystal wall, lamps
Product quantity:284 pcs
Project time:8months
Deepen design time: 4 months
Production time: 3months
Installation time:1month
Maximum size:7000*6800*50MM
Maximum weight: 1860KG
The crystal art background of the huge hotel front desk of about 30 square meters is the hotel art customization project of MATTEO brand in 2020.Through a large number of (60*50*40MM)transparent crystals polished, drilled, painted, assembled and installed, the gravity structure uses about 4MM stainless steel wires, which are installed and fixed with the ceiling of the original building.
The overall design concept is the traditional Chinese simplified abstract landscape painting. Using modern techniques and materials, the hotel front desk is designed with giant background crystal decorative painting, a large number of crystal cubes, each crystal displays different colors, and is combined in jigsaw puzzle form. Nearby, you can find the unique texture of crystal and the refraction effect of light, which makes the process more delicate. From a distance, it is a giant Chinese landscape painting.
At the same time of production, communicate with the construction team and determine the embedded scheme of crystal background, which requires to meet the requirements of load-bearing and accuracy, and the work can be successfully completed when it is formally installed. The final effect shows unexpected momentum and high-level feeling. Customized ceiling partition Chinese style hanging indoor restaurant art partition divider screen.
.
Get the latest price? We'll respond as soon as possible(within 12 hours)